DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-632test pkt
8
For the following output example, the command test packet-control 1B was
entered. Note that carrier B is the active carrier in these example outputs.
For the following output example, the command test packet-control 1A was
entered. Note that carrier A is the standby carrier in these example outputs.
Feature Interactions
The reset packet-control test (586) does not run on the active packet-control.
This test is part of the standby packet-control test sequence as illustrated in the
Output section of this manual page.
test pkt
This command will test the Packet bus on the specified PPN or EPN.
Synopsis
test pkt port-network pn number
[ short | long ][ repeat number | clear ] schedule
test packet-control 1B
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01B PKT-CTRL 585 PASS
Command successfully completed
test packet-control 1A
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01A PKT-CTRL 586 PASS
01A PKT-CTRL 583 PASS
01A PKT-CTRL 585 PASS
Command successfully completed