Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-141ASAI-PT
10
Table 10-47. TEST #618 BRI Port Local LAN Looparound
Error
Code
Test
Result Description/Recommendation
1015 ABORT The port is not in the out-of-service state.
1. Display the Port Status form using the status bri-port PCSSpp
command to determine which stations or adjuncts are on this port.
2. Use the extension shown on this form in the status station command to
determine if the station or adjunct is in use.
3. If the port is in use, wait until it is idle, and use the busyout port
PCSSpp command to place it in the out-of-service state and repeat this
test.
!
WARNING:
Since the "busyout" command is destructive, using this command
prior to the port being idle causes all transactions associated with the
ASAI on the port to be torn down. Note that third party calls
established by an ASAI adjunct remain connected even though the
port is taken out-of-service.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp command
and review the results of the BRI Port Local LAN Looparound Test to
verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Follow the repair procedures for the PKT-CTRL.
2. Issue the test port long PCSSpp command and review the results of
the BRI Port Local LAN Looparound Test to verify the repair.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. Issue the test port long PCSSpp command and review the results of
the BRI Port Local LAN Looparound Test to verify the repair.
2012 ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page