Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-214BRI-SET, ASAI-ADJ, BRI-DAT
10
Table 10-69. TEST #629 BRI Layer 3 Query
Error
Code
Test
Result Description/ Recommendation
1005 ABORT The endpoint’s MIMs Supported? field is administered to
"no."
1. Use the change station extension command to
change the parameter only if the endpoint
documentation reflects support for ISDN-BRI
Management and Maintenance Procedures.
1113 ABORT The signaling link between the switch and the endpoint
or adjunct is down.
1. Use the test port PCSSpp long command to clear
any errors which prevent establishment of the
signaling link.
2. Examine the results of Test #626, which is executed
with the command. If this test aborts or fails, follow
the repair procedure for the Signaling Link Status
Test.
3. Escalate problem if BRI Layer 3 Query Test
continues to abort.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the
BRI Port Local LAN Loop Around Test to verify the
repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Consult the repair procedure for PKT-CTRL (Packet
Control Circuit Pack) Maintenance documentation.
2. If Step 1 does not resolve the problem, escalate to
the next tier.
Continued on next page