Maintenance Object Repair Procedures
Page 10-1214S-SYN-PT (Speech Synthesis Port)
10
Conference Circuit Test (#7)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain, and provides conferencing functions on
a per-port basis. The Conference Circuit Test verifies that the NPE channel for
the port being tested can correctly perform the conferencing function. The NPE is
instructed to listen to several different tones and conference the tones together.
The resulting signal is then measured by a Tone Detector port. If the level of the
tone is within a certain range, the test passes.
Any FAIL The NPE of the tested port was found to be transmitting
in error. This causes noisy and unreliable connections.
1. Replace the circuit pack.
PASS The port is correctly using its allocated time slots.
User-reported troubles on this port should be
investigated using other port tests and examining the
Error Log.
Table 10-375. TEST #7 Conference Circuit Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-374. TEST #6 NPE Crosstalk Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page