Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-341CO-TRK (CO Trunk)
10
CO Demand Diagnostic Test (#3)
For ground start trunks only, port circuit pack relays are operated and checks are
made to see if the port can detect and apply ground on the Tip lead. This test
also verifies that there is no external ground on the Ring lead. In the absence of
other failures, the circuit pack should be replaced only if this test fails with the CO
line disconnected.
For the TN2147 World Class Central Office circuit pack, this test also checks the
on-board programmable transmission circuitry that allows the circuit pack to
support the transmission characteristics of several countries.
0NO
BOARD
The test could not relate the internal ID to the port (no
board).
1. Check to ensure that the board translations are
correct. Translate the board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should
re-establish the linkage between the internal ID and
the port.
Table 10-95. TEST #3 CO Demand Diagnostic Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate system resources to run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-94. TEST #0 Dial Tone Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page