Maintenance Object Repair Procedures
Page 10-1216S-SYN-PT (Speech Synthesis Port)
10
Speech Synthesis DTMF Receiver Test (#163)
A series of DTMF tones are conferenced from the TDM Bus into the port’s DTMF
receiver and checked to see if the correct tones have been detected during the
correct intervals. If all the DTMF tones were detected correctly, the test passes. If
any of the tones were not detected correctly, the test fails.
PASS The port can correctly conference multiple connections.
User-reported troubles on this port should be
investigated using other port tests and examining the
Error Log.
Table 10-376. TEST #163 Speech Synthesis DTMF Receiver
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1000 ABORT System resources required to run this test are not
available. The port may be busy with a valid call and
therefore unavailable for certain tests. You must wait
until the port is idle (yellow LED if off) before retesting.
1. If the port is idle, retry the command at one-minute
intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-375. TEST #7 Conference Circuit Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page