Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1473TIE-TRK (Tie Trunk)
10
2000 ABORT Response to the test request was not received within the
allowable time period.
2100 ABORT Could not allocate the necessary system resources to
run the test. This could be due to a failure to seize the
port.
1. Retry the command at 1-minute intervals a maximum
of 5 times.
2. If the test continues to abort, escalate the problem.
1 FAIL The E lead test failed due to an on-board port problem.
1. Replace the circuit pack.
2 FAIL The M lead test failed. The EPF has experienced an
overcurrent condition, perhaps due to the external M
lead.
1. To make sure the problem is on-board, disconnect
the facility from the pack and retry the test.
2. If the test fails, replace the circuit pack. Otherwise,
check the external wiring toward the far-end PBX.
PASS Tie Trunk EPF test is successful. This port is functioning
properly.
1. If users are reporting troubles, examine loop
connections to the port.
0NO
BOARD
The test could not relate the internal ID to the port (no
board).
1. Check to ensure that the board translations are
correct. Translate the board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should
re-establish the linkage between the internal ID and
the port.
Table 10-446. TEST #74 Tie Trunk EPF Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page