DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1683XXX-BD (Common Port Circuit Pack)
10
1018 ABORT
(cont’d.)
5. Retry the command again.
6. If the test continues to abort with neon translated
ports, escalate the problem.
7. Retry the command at one-minute intervals a
maximum of five times.
8. If the test continues to abort, look for RING-GEN
errors in the Error Log. If an ABORT 1008 occurs for
this test on other circuit packs as well, then the
ringing generator may be defective or is not wired
correctly (see errors for RING-GEN). If it doesn’t
occur on port test 48 for ANL-16-L, all four ring
phases are in use.
9. If the test to continues to abort, escalate the
problem.
10. Retry the command again.
11. If the test continues to abort with neon translated
ports, escalate the problem.
2000 ABORT Response to the request was not received within the
allowable time period.
2100 ABORT Could not allocate the necessary system resources to
run this test.
ABORT Could not allocate the necessary system resources to
run this test. Internal System Error.
1. If Error Type 1538 is present in the Error Log, follow
the recommended maintenance strategy.
Table 10-496. TEST #220 Neon Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page