DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-744HYB-LINE (Hybrid Line)
10
1018 ABORT Test disabled via administration. This only applies to
analog stations.
The default for this field is ‘y,’ so you may want to
determine why it has been turned off for this station.
1. To enable test, set the Test field on the station
administration screen for the particular analog
station being tested to ‘y.’ Use the change station
<extension> command.
2000 ABORT Response to the test request was not received within the
allowable time period.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
2020 ABORT The test did not run due to an already existing error on
the specific port or a more general circuit pack error.
1. Examine Error Log for existing errors against this
port or the circuit pack and attempt to diagnose the
already existing error.
2100 ABORT Could not allocate the necessary system resources to
run this test. This could be due to a failure to seize the
port.
1. Retry the command at 1-minute intervals a maximum
of 5 times.
2. If the test continues to abort, escalate the problem.
Table 10-207. TEST #6 NPE Crosstalk Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page