DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-616test memory
8
Feature Interactions
The long test on EPN maintenance circuit packs will cause the EPNSAT link to be
dropped. The reset test is the last test and drops this link.
test memory
This command will test memory circuit packs.
Synopsis
test memory location
[ short | long ][ repeat number | clear ] schedule
Permissions
The following default logins may execute this command: system technician,
inads, init, nms.
Examples
test memory
test memory a
test memory a schedule
test memory 1a2
test memory b1 sh
test memory b l r 25
test memory a l c
test maintenance 2
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
02A MAINT 106 PASS
02A MAINT 229 PASS
02A MAINT 303 PASS
02A MAINT 337 PASS
Command Successfully Completed