DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-180BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI ISDN-BRI Port)
10
3 FAIL Received a status of Level 1 Deactivated; the port is
out-of-service.
1. Issue the status bri-port PCSSpp command to
verify that the service state of the port is
out-of-service. If the service state of the port is not
out-of-service, escalate the problem to the next tier.
Otherwise, proceed to Step 2.
2. If the port has been placed out-of-service via the
busyout port PCSSpp command, try releasing the
port by executing the release port PCSSpp
command. Then issue the test port long PCSSpp
command, and review the results of Level 1 Status
Inquiry test. If this test is still failing, proceed to Step
3.
3. After executing the test port long PCSSpp
command, review the results of all the tests. Follow
the repair procedures for any tests that fail. Verify
repair of the problem by executing the test port
PCSSpp command and by determining that the
Level 1 Status test passes. If the test continues to fail
for this reason, proceed to Step 4.
4. Escalate the problem to the next tier.
4 FAIL For the TN2198 only:
Received a status of Level 1 Pending Activation, the NT1
has a loss of power indicating a problem with the NT1.
1. For the NT1 follow the manufacturers recommended
repair procedures.
2. Execute the test port PCSSpp command, and
review the results of the Level 1 Status Inquiry test to
verify the repair. If the test is still failing proceed to
Step 3.
3. Escalate the problem to the next tier.
PASS This test indicates that Level 1 is activated, or that
software has taken the port out of service.
Table 10-58. TEST #621 Level 1 Status Inquiry — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page