Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-205BRI-SET, ASAI-ADJ, BRI-DAT
10
This test is not executed for ASAI adjuncts because adjuncts do not support
MIMs upon which this test is based.
Table 10-67. TEST #627 BRI Remote Loop Back
Error
Code
Test
Result Description/ Recommendation
1000 ABORT Could not seize the endpoint or B-channels for test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1005 ABORT The endpoint’s MIMs Supported field is administered to
"no."
1. Use the change station extension command to
change parameter only if the endpoint
documentation reflects support for ISDN-BRI
Management and Maintenance Procedures.
1113 ABORT The signaling link between the switch and the endpoint
is down.
1. Use the test port PCSSpp long command to clear
any errors which prevent establishment of the
signaling link.
2. Examine the results of the Signaling Link Status Test
(#626) which is run as part of this command. If this
test aborts or fails, follow the repair procedure for
Test #626.
3. If the XID Test continues to abort, escalate the
problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the
BRI Port Local LAN Loop Around Test to verify the
repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack)
Maintenance documentation.
2. If Step 1 does not resolve the problem, escalate to
the next tier.
Continued on next page