Maintenance Object Repair Procedures
Page 10-523DIOD-TRK (DIOD Trunk) [G1.2SE]
10
Loop Around and Conference Circuit Test (#33)
This test checks the reflective loop and conference abilities of a CO port circuit.
The test uses 404 Hz, 1004 Hz, and 2804 Hz tones. Each tone is transmitted
separately through the loop and checked.
1004 ABORT The port was seized by a valid call during the test. The
test has been aborted. Use the display port PCSSpp
command to determine the trunk group/member number
of the port. Use the status trunk command to determine
the service state of the port. If the service state indicates
that the port is in use, then the port is unavailable for
certain tests. (Refer to the "Status Commands" section in
Chapter 10, "Maintenance Commands and
Trouble-Clearing Aids" for a full description of all
possible states.) You must wait until the port is idle
before retesting.
2000 ABORT Response to the test request was not received within the
allowable time period.
2100 ABORT Could not allocate the necessary system resources to
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
Any FAIL The NPE of the tested port was found to be transmitting
in error. This causes noisy and unreliable connections.
1. Replace the circuit pack.
PASS The port is correctly using its allocated time slots.
User-reported troubles on this port should be
investigated by using other port tests and by examining
trunk or external wiring.
Table 10-141. TEST #6 NPE Crosstalk Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page