DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-521DIOD-TRK (DIOD Trunk) [G1.2SE]
10
other connections. If the NPE is not working correctly, one way and noisy
connections may be observed. This test is usually only part of a port’s long test
sequence and takes approximately 20 to 30 seconds to complete.
Table 10-141. TEST #6 NPE Crosstalk Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1000 ABORT System resources required to run this test are not
available. The port may be busy with a valid call. Use
the display port PCSSpp command to determine the
trunk group/member number of the port. Use the status
trunk command to determine the service state of the
port. If the service state indicates that the port is in use,
then the port is unavailable for certain tests. (Refer to the
"Status Commands" section in Chapter 10, "Maintenance
Commands and Trouble-Clearing Aids" for a full
description of all possible states.) You must wait until the
port is idle before retesting.
1. If the port status is idle, then retry the command at
one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
1001 ABORT Could not allocate the necessary system resources to
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page