DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1470TIE-TRK (Tie Trunk)
10
Tie Trunk EPF Test (#74)
This test consists of an E lead and M lead test. The E lead test checks for the
proper activation and deactivation of the port’s E lead. The M lead test checks
the M lead EPF current flow. The processor sends an M lead test request to the
circuit pack and receives the results. The returned results are measured to see if
a port or external tie trunk line fails.
0NO
BOARD
The test could not relate the internal ID to the port (no
board).
1. Check to ensure that the board translations are
correct. Translate the board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should
re-establish the linkage between the internal ID and
the port.
Table 10-445. Seizure Tests (#73, #747, #73) — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page