DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-890MET-LINE (MET Line)
10
FAIL The test failed with an internal error while it was
attempting to turn on the EPF.
1. Retry the command at 1-minute intervals a maximum
of 5 times.
2. If the test continues to abort, escalate the problem.
PASS EAF Test passed. The message to turn on the power to
the station was successfully sent to the port.
1. Although this test never returns a FAIL result, after
running this test, the Error Log should be checked
for any entries with Error Type 257 to examine the
real results of this test.
2. If Error Type 257 does not appear in the Error Log
within 10 seconds after completion of this test, it is
safe to assume that the test sensed no problems
with the power to the station. To verify that the station
is powered up correctly, run a self-test on the
station, if available, and check that all the feature
buttons are operating.
3. If Error Type 257 appears in the Error Log, this
indicates some problem with the power to the
station. The system technician should check for a
short in the wiring, a damaged jack, a defective
voice terminal, or an incorrect type of terminal.
Table 10-254. TEST #56 MET Electronic Power Feed Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page