Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-291CARR-POW (Carrier Port Power Unit) for DC-Powered Systems
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Battery & Battery Charger Query Test
, for example, you may also clear errors
generated from other tests in the testing sequence.
a. Refer to POWER (Battery & Battery Charger) Maintenance documentation
for a description of this test.
b. Refer to AC-POWER (AC Power) Maintenance documentation for a
description of this test.
c. Refer to EMG-XFER (Emergency Transfer) Maintenance documentation
for a description of this test.
d. Refer to CABINET (Cabinet Sensors) Maintenance documentation for a
description of this test.
e. Refer to EXT-DEV (External Alarm) Maintenance documentation for a
description of this test.
1. D = Destructive; ND = Nondestructive
Order of Investigation
Short
Test
Sequence
Long
Test
Sequence D/ND
1
Battery & Battery Charger Query Test (#5)
(a)
XXND
AC Power Query Test (#78) (b) X X ND
Power Unit Query Test (carrier E) (#127) X X ND
Power Unit Query Test (carrier D) (#127) X X ND
Power Unit Query Test (carrier A) (#127) X X ND
Power Unit Query Test (carrier B) (#127) X X ND
Power Unit Query Test (carrier C) (#127) X X ND
Emergency Transfer Query Test (#124) (c) X X ND
Cabinet Temperature Query Test (#122) (d) X X ND
External Alarm Lead Query Test (#120) (e) X X ND
Analog Ring Generator Initialization Test
(#117) (f)
XXND
Analog Ring Generator Query Test (#118)
(f)
XXND