DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-508DIOD-DS1 (DS1 DIOD Trunk)
10
DS1 CO Dial Tone Seizure Test (#314)
DS1 CO Dial Tone Seizure Test checks the trunk’s signaling capability provided
by the DS1 Interface circuit pack. The maintenance software initiates the test by
sending a ‘‘seizure’’ message to the DS1 Interface circuit pack and expects an
‘‘active’’ reply from the DS1 interface circuit pack. If the ‘‘active’’ message is
received, then the test passes. If no message is received and the timer expires,
the test is aborted. If the DS1 Interface circuit pack sends a ‘‘reorder’’ message
back to maintenance software, then the test fails.
Table 10-137. TEST #36 Port Audit and Update Test
Error
Code
Test
Result Description/ Recommendation
ABORT Internal System Error
1. Retry the command at 1-minute intervals a maximum
of 5 times.
2. If the test continues to abort, escalate the problem.
2000 ABORT Response to the test request was not received within the
allowable time period.
2100 ABORT Could not allocate the necessary system resources to
run this test.
FAIL Test failed due to internal system error.
1. Retry the command at 1-minute intervals a maximum
of 5 times.
2. If test continues to fail, escalate the problem.
PASS Trunk translation has been updated successfully. The
current trunk states kept in the DS1 Interface circuit
pack and switch software are consistent. If the trunk is
busied out, the test will not run but will return PASS. To
verify that the trunk is in-service:
1. Enter the status trunk command to verify that the
trunk is in-service. If the trunk is in-service, no further
action is necessary. If the trunk is out-of-service,
continue to step 2.
2. Enter the release trunk command to put the trunk
back into in-service.
3. Retry the test command.
Continued on next page