DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1060PI-LINK (Processor Interface Link)
10
status is not "in-service," then go to Step 2. If the link status is "in-service"
and (for X.25) some of the processor channel pairs are incomplete
(remote channel not specified, meaning that the processor channels are
not connected), then look at the status of "status processor-channel" for
the local processor channels that are not connected.
2. Look for active PI-SCI alarms and follow the procedure for those alarms if
there are any. If there are no PI-SCI problems, go on to the next step.
3. If the link is still down, restart the link via the busyout link lnk-no system
technician command followed by the release link lnk-no command. This
sequence tears down the call and then tries to bring it back up. If the link
is for DCS, it may speed the recovery of the link if busyout link lnk-no
and release link lnk-no commands are executed on the switch that is
establishing the connection (see Communication Link form). If the link
does not recover, go on to the next step.
4. Check the status of the remote endpoint.
a. If the link is busied out, release it.
b. Is the switch down or restarting?
5. If link was never brought up:
a. Using
DEFINITY Communications System, Generic 1 and System
75 Administration and Measurement Reports,
555-200-500 and
DEFINITY Enterprise Communications Server Release 5.4
Administrationand Feature Descriptions
, for instructions as needed,
verify that the administration is correct as follows:
— Enter the display ds1 PCSS command. Check the
compatibility of the DS1 parameters with the far-end and the
CSU.
— Enter display communication-interface links command.
— Enter the display communication-interface
processor-channels command. Enter the display
communication-interface hop-channels command (if
hop-channels are being used).
— Enter the display trunk <grp>/<mbr> command (if DS1 is
being used for DCS).
— Enter the status sync command (if DS1 is being used)—
make sure the primary synchronization is administered.
6. If link is an EIA link:
— Verify via the Communication-Interface Links form that the
information for the EIA connection is correct on the local and
remote PBXs.