DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-613test maintenance
8
Feature Interactions
None.
test maintenance
This command will test the EPN maintenance circuit pack in any Expansion Port
Network control carrier.
Synopsis
test maintenance location
[ short | long ][ repeat number | clear ] schedule
Permissions
The following default logins may execute this command: system technician,
inads, init.
Examples
test maintenance 2
test maintenance 3 schedule
test maintenance 2 sh
test maintenance 2 l c
Description
The test maintenance command performs hardware diagnostic tests on a
technician specified maintenance circuit pack. Specifying cabinets 2 through 3
will allow testing of any connected EPN maintenance circuit packs.
test link 1 long
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01AXX01 PI-LINK 182 PASS
01AXX01 PI-LINK 183 PASS
01AXX01 PI-LINK 234 PASS
01AXX01 PI-LINK 233 PASS
Command Successfully Completed