DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-210BRI-SET, ASAI-ADJ, BRI-DAT
10
Table 10-68. TEST #628 BRI XID
Error
Code
Test
Result Description/ Recommendation
1000 ABORT The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ
is busy. The test cannot be executed at this time:
1. Pause momentarily (30 seconds) and re-execute at
this time.
2. If this problem persists, escalate this problem.
NOTE:
A BRI-PORT can also be busy. When using this for
BRI-PORT/ABRI-PORT tests, the words "BRI-SET,
ASAI-ADJ, ATT-ADJ, " can be changed to
"BRI-PORT, ABRI-PORT, ATT-ADJ."
1005 ABORT The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects support XID
testing, use the change station extension
command to change the XID Testing? field on the
form to "yes."
1113 ABORT The signaling link between the switch and the endpoint
is down.
1. Use the test port PCSSpp l command to clear any
errors which prevent establishment of the signaling
link.
2. Examine the results of the Signaling Link Status Test
(#626) which is run as part of this command. If this
test aborts or fails, follow the repair procedure for
Test #626.
3. If the XID test continues to abort, escalate the
problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the
BRI Port Local LAN Loop Around Test to verify the
repair.
Continued on next page