Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1069PI-PT (Processor Interface Port)
10
Notes:
a. PI-LINK raised this alarm against PI-PT. The Processor Interface Loop
Around test failed on one of the ports. Refer to PI-LINK Maintenance
documentation for details on resolving this alarm. If this error resulted in an
SPE-interchange, then issue the test interface PCS sh command on the
Standby Processor Interface to try to resolve the alarm.
b. This error type indicates that the circuit pack has been removed or has
been insane for more than 11 minutes. To clear the error, reinsert or
replace the circuit pack.
System Technician-Demanded Tests:
Descriptions and Error Codes
PI-PT can be tested by issuing the test interface PCS command on the Standby
Processor Interface circuit pack. If the Active TN765 Processor Interface circuit
pack is tested, then the active test sequence is run (which is DESTRUCTIVE).
[Refer to PI-SCI (System Communication Interface) Maintenance documentation
for details on these tests]. Only the Standby Processor Interface test sequence
runs tests directly on PI-PT.
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Standby Processor Interface Port Test
, for example, you may also clear errors
generated from other tests in the testing sequence.
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
130 (b) None
257 (a) Any None MAJOR ON test link lnk-no l
Table 10-309. Processor Interface Port PI-PT Error Log Entries Continued
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
Continued on next page