DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-487status periodic-scheduled
8
Permissions
The following default logins may execute this command: system technician,
inads, init.
Examples
status periodic-scheduled
status periodic-scheduled print
Description
The status periodic-scheduled command displays summary information on
active scheduled and periodic testing. Periodic tests are run every hour, while
scheduled tests are run every 24 hours. Scheduled tests can have their starting
and stopping times administered. For periodic maintenance, the completion
percentage for all resources will be displayed for the current cycle of testing as
well as the previous cycle of testing. For scheduled maintenance, the completion
percentage of all resources will be displayed for the last 24 hour testing cycle.
Defaults
No defaults.
Parameters
Help Messages
If the system technician presses HELP after entering "status period-scheduled",
the following message will be displayed:
[’print’]
Error Messages
If during the execution of a command a resource problem occurs that requires
the user to restart the command, then the following message will be displayed:
Command resources busy;
Press CANCEL to clear, and then resubmit.
If all of the available maintenance resources are currently in use, then the
following message will be displayed:
All maintenance resources busy; try again later.
print This will cause the report to be printed if a printer is linked to the SAT.