DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-771INADS (INADS Link)
10
10 0 There is already a test inads-link command in progress.
1. Wait 10 minutes for the present command to finish.
2. Review the results of the present command by viewing the
Error Log and selecting the category "inads-link."
11 0 The switch is trying to report alarms to INADS. The test cannot be
run at this time.
1. Wait 10 minutes and retry the command.
Table 10-215. INADS Link Error Log Entries Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page