Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1321SW-CTL (Switch Control)
10
Switch Control EPN Maintenance Board Interface
Test (#324)
Loop back messages are sent to the Switch Control via the interface used for
EPN maintenance circuit pack messages. The messages are returned to the SPE
for verification via the same interface.
Table 10-400. TEST #324 Switch Control EPN Maintenance Board Interface Test
Error
Code
Test
Result Description/ Recommendation
1005 ABORT The system does not contain an EPN, so this test is not executed.
1030 ABORT The component on which the test was to be run is on the Standby SPE. This
test may only be run on this component when it resides on the Active SPE.
1. For recommended maintenance procedure, refer to ABORT Error
Code 1030 in STBY-SPE Maintenance documentation.
32400 ABORT Test disabled via software patch.
2012
32413
32416
32423
32425
ABORT Internal system error
2013
32411
32421
ABORT Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
32414
32417
32424
32427
ABORT The messages failed to return (timed out) and were not verified.
1. Retry the command at 1-minute intervals a maximum of five retries.
2. If the test continues to abort and SW-CTL Test #325 passes, there is
not a problem, but if SW-CTL Test #325 fails, follow the
recommendations for SW-CTL Test #325.
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT Refer to “Standby SPE” for a description of these error codes.
ABORT Refer to “STBY-SPE” for a description of these error codes.
Continued on next page