DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-937MMI-BD
10
Control Channel Looparound Test (#52)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit
Pack) maintenance documentation as Control Channel Looparound Test (#52).
SAKI Sanity Test (#53)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit
Pack) maintenance documentation as SAKI Sanity Test (#53).
FAIL The MMI circuit pack is out of MMI synchronization. Run the long option of the
test board command.
1. Wait up to 5 minutes, and then reset the circuit pack with these
commands: busyout board PCSS, then reset board PCSS, followed by
release board PCSS.
2. Rerun the test; if the same result occurs again, replace the circuit pack.
1100 PASS The MMI circuit pack is providing the synchronization correctly. This MMI
circuit pack is designated as the Master Sync source.
1101 PASS The MMI circuit pack is listening to the synchronization signal correctly.
Table 10-268. TEST #1122/1123 MMI Synchronization Status Test — Continued
Error
Code
Test
Result Description/Recommendation
Continued on next page