DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-887MET-LINE (MET Line)
10
1004 ABORT The port was seized by a valid call during the test. The
test has been aborted. Use the display port PCSSpp
command to determine the station extension of the port.
Use the status station command to determine the
service state of the port. If the service state indicates
that the port is in use, then the port is unavailable for
certain tests. (See Chapter 8, ‘‘
Maintenance Commands
and Trouble-Clearing Aids’’, for a full description of all
possible states.) You must wait until the port is idle
before retesting.
NOTE:
The battery feed circuitry is tested for proper
battery voltage by testing the switchhook state. In
response to the test message, the on-board
firmware terminates the line and checks for
switch-hook presence. The termination is then
removed, and a check is made for no switch-hook
presence. The MET set must be on-hook for the
test to execute.
1. If the port status is idle, then retry the command at
1-minute intervals a maximum of 5 times.
2. If the test continues to abort and the port is not in
use, escalate the problem.
1018 ABORT Test disabled via software patch.
1. Escalate to next tier level.
2000 ABORT This port may have been busied out by system
technician.
1. Look in the Error Log for Error Type 18 (port busied
out) for this port. If this error type is present, then
release the port via the release station
<extension> command and run the test again.
2. Make sure that the terminal is connected.
3. Retry the command at one-minute intervals a
maximum of five times.
4. If the test continues to abort, escalate the problem.
Table 10-253. TEST #35 Port Diagnostic Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page