DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-222BRI-SET, ASAI-ADJ, BRI-DAT
10
The abbreviations used in (Service SPID Display) have the following meanings:
SPID Facility Test
Test
Result Description / Recommendation
FAIL No response is received from the endpoint.
1. Check the physical wiring between the switch and the
endpoint or adjunct.
2. If test continues to fail, escalate to the next tier.
FAIL Display does not match administered port address for the
endpoint or adjunct.
1. Change station administration for endpoint or adjunct to
match displayed port address.
2. If test continues to fail, escalate the problem.
PASS Display matches administered port address for the endpoint or
adjunct.
For BRI endpoints:
1. Verify that the SPID values administered in the switch and
the endpoint are consistent.
2. If the SPID values are correct, replace the endpoint.
3. If test continues to fail, escalate the problem.
For ASAI adjuncts:
1. Verify that the TEI values administered in the switch and the
adjunct are consistent.
2. If the TEI values are correct, consult the recommended
repair procedures of the manufacturer for the adjunct.
3. If test continues to fail, escalate the problem.
P port network (1,2, ...)
C Carrier (A,B,C, ...)
SS Slot (01, 02, ...)
pp port (01-12)
ext extension one and two (one through 99999)
SPID service order profile identifier