DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-657test sp-link
8
Feature Interactions
Additional data is available after running a test. See the status signaling-group
command for details on how to access the additional data.
test sp-link
This command performs a set of hardware diagnostic tests on the system printer
link (if one exists). The tests vary according to whether a short or long option is
specified.
Synopsis
test sp-link
[ short | long ] schedule
Permissions
The following default logins may execute this command: system technician,
inads, init.
Examples
test sp-link
test sp-link sh
test sp-link l
test sp-link schedule
test sp-link sh sch
test signaling-group 1 SPE A
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
1 ISDN-SGR 636 PASS
1 ISDN-SGR 639 PASS
1 ISDN-SGR 637 PASS
Command Successfully Completed