Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1237SHDW-LNK (Memory Shadowing Link)
10
Error Log Entries and Test to Clear Values
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below . By clearing
error codes associated with the
Shadow Link Test,
for example, you may also
clear errors generated from other tests in the testing sequence.
The Short and Long Test Sequences for Memory Shadowing Link are identical.
Only one test (Test #318) tests the Memory Shadowing Link.
Shadow Link Test (#318)
Interactions
One interaction with the Standby SPE that results when testing the Memory
Shadowing Link is as follows:
If the Standby SPE is in Maintenance Mode because a previous test command
on a Standby SPE component was issued within the last three minutes, the Active
SPE takes the Standby SPE out of Maintenance Mode and puts it in Standby
Mode when the Shadow Link Test is run. Therefore, issuing another test
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
1. D = Destructive; ND = Nondestructive
Table 10-387. Standby SPE Error Log Entries
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
0
1
0 Any Any Any test shadow-link
2047 Shadow Link Test (#318) MAJOR OFF test shadow-link
2048 Shadow Link Test (#318) MAJOR OFF test shadow-link
2049 Shadow Link Test (#318) MAJOR OFF test shadow-link
2050 Shadow Link Test (#318) MAJOR OFF test shadow-link
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
Shadow Link Test (#318) X X ND