DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-808ISDN-SGR (ISDN-PRI Signaling Group)
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
Primary Signaling Link Hardware Check
, for
example, you may also clear errors generated from other tests in the testing
sequence.
Primary Signaling Link Hardware Check (#636)
The ISDN-PRI Signaling Link Port itself depends on the health of the DS1/UDS1
Interface circuit pack on which it resides. This test will fail if there are problems
with either the ISDN-PRI Primary D-channel port or the DS1/UDS1 circuit pack.
The ISDN-PRI Primary D-channel also depends on the health of either the
Processor Interface Link or the Processor Control circuit pack providing
connectivity to the DS1/UDS1 circuit pack.
If there are problems with the ISDN-PRI Signaling Link, also investigate the
DS1/UDS1 circuit pack (DS1-BD/UDS1-BD) and the Processor Interface Link or
Packet Control (PI-LINK/PACCON) dependent upon which is used
1. D = Destructive; ND = Nondestructive
Order of Investigation
Short
Test
Sequence
Long
Test
Sequence D/ND
1
Primary Signaling Link Hardware Check (#636) X X ND
Secondary Signaling Link Hardware Check (#639) X X ND
Layer 2 Query Test (#647) X X ND
Remote Layer 3 Query Test (#637) X X ND