DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-957M/T-ANL (Maintenance/Test Analog Port)
10
1002 ABORT The system could not allocate time slots for the test. The
system may be under heavy traffic conditions, or it may
have time slots out-of-service due to TDM-BUS errors.
Refer to TDM-BUS Maintenance to diagnose any active
TDM-BUS errors. A system is considered under heavy
traffic when the Call Processing Occupancy is greater
than 50% or when the System Management and the Call
Processing Occupancies together exceed 65%. To view
the system occupancy measurements enter the
command status system health on the system
technician terminal.
1. If the system has no TDM-BUS errors and is not
handling heavy traffic, repeat the test at 1 minute
intervals a maximum of 3 times.
2. If the test continues to abort, escalate the problem.
1003 ABORT The system could not allocate a tone receiver for the
test. The system may be oversized for the number of
tone detectors present, or some tone detectors may be
out-of-service.
1. Look for TTR-LEV errors in the Error Log. If present,
refer to TTR-LEV Maintenance documentation.
2. Look for TONE-PT errors in the Error Log. If present,
refer to TONE-PT Maintenance documentation.
3. If neither condition exists, retry the command at 1
minute intervals a maximum of 3 times.
4. If the test continues to abort, escalate the problem.
1004 ABORT The port was seized by a valid ATMS Test Call.
1. Retry the command at 1 minute intervals a maximum
of 3 times.
2. If the test continues to abort and the port is not in
use on a valid ATMS Test Call, escalate the problem.
To determine whether the port is in use by an ATMS
Test Call enter status station ext where ext is the
assigned ATMS station number.
Table 10-274. TEST #13 Analog Port Digital Loop Around Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page