DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1126POWER (Battery & Battery Charger) for AC-Powered Systems
10
NOTE:
This test only shows up in the test sequence if there is a Tone-Clock
circuit pack in the port network being tested.
Battery & Battery Charger Query Test (#5)
This test queries the Maintenance/Tape Processor in a multicarrier cabinet PPN
system without High or Critical Reliability, the Duplication Interface circuit pack in
a PPN for a High or Critical Reliability system, or the EPN Maintenance circuit
pack in an EPN for the status of the battery pack and battery charger, and
reports the result. During this test, the status LED battery charger is lit and
extinguished if the status of the battery charger is reported as normal. This event
is a result of checking that the battery charger is connected.
Table 10-332. TEST #5 Battery & Battery Charger Query Test
Error
Code
Test
Result Description/ Recommendation
1000 ABORT System resources required to run this test are not
available.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1005 ABORT Battery Charger is not connected.
1. If the system has a UPS supplying the power, ignore
this error since the UPS supplies the power, not the
battery and battery charger.
2. The batteries probably need charging and may be
drained if there were power outages. Reconnect the
battery charger to allow the batteries to recharge. If
Test #5 is run before the batteries are completely
charged, the test fails.
3. Wait 24 hours and rerun the test.