DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-275CARR-POW (Carrier Port Power Unit) for AC-Powered Systems
10
1129 ABORT Only occurs when recycling carrier 2B. Indicates
that the Active Tone-Clock for the EPN is in carrier
2B.
1. Issue the set tone-clock 2A command.
2. Rerun the test.
1130 ABORT Only occurs when recycling carrier 2B. Indicates
that the Active Expansion Interface Link for the
EPN is in carrier 2B.
1. Issue the set expansion-link A01 command.
2. Rerun the test.
2000 ABORT Response to the test request was not received
within the allowable time period.
2029 ABORT Internal System Error.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the
problem.
1 (Carrier E)
2 (Carrier D)
4 (Carrier A)
8 (Carrier B)
16 (Carrier C)
FAIL There is a problem with one or both Power Unit(s)
on the recycled carrier.
1. Since the Power Unit Recycle Test failed, both
Power Units in the recycled carrier should
have been powered off by the system
software. Both power units should be showing
a red status LED, instead of a green one.
Since the Power Unit Query Test is a subset of
the Power Unit Recycle Test, the Power Unit
Query Test (#127) should also fail. Run the
Power Unit Query Test by using the test
environment P command where P is the
appropriate port network number.
2. If the test fails, follow the repair procedures
described for Test #127. If problem persists,
follow normal escalation procedures.
Table 10-82. TEST #126 Power Unit Recycle Test — Continued
Error Code
Test
Result Description/ Recommendation
Continued on next page