Lucent Technologies R5SI Computer Hardware User Manual


  Open as PDF
of 2643
 
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-412V-PWR (12 Volt Power Supply)
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the following table. By clearing
error codes associated with the
12 Volt Power Supply Test
for example, you may
also clear errors generated from other tests in the testing sequence. The 12 Volt
Power Supply Test can be initiated via either the test card-mem command or the
test network-control command.
12 Volt Power Supply Test (#701)
This test is nondestructive.
The purpose of the test is to diagnose the 12 volt power supply unit in the
TN777B NETCON circuit pack. No erase and write-to-memory operations are
started or verified during the test. The contents of flash memory and of the
memory card should not be changed.
The test turns on the power supply, and it verifies that 12 volt power appears by
reading the control register in the TN777B NETCON circuit pack. After the power
supply is turned on, the maintenance software waits for three seconds before
verifying the appearance of 12 volt power. After the 12 volt power supply can be
turned on and verified, the test turns the power supply off and then verifies that
1. D = Destructive; ND = Nondestructive
2. Refer to “CARD-MEM (Memory Card)” information for a description of this test.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
Reset Board
Sequence D/ND
1
12 Volt Power Supply Test (#701) X X ND
Memory Card Insertion Test (#695)
2
XX ND
Memory Card Format and Read Test
(#696) (a)
XX ND
Memory Card Match Test (#697)
2
XX ND
Memory Card Write-Protected Test
(#698)
2
XX ND
Memory Card Directory Recovery Test
(#699)
2
XX ND
Memory Card Translation Data Integrity
Test (#694)
2
XND
Memory Card Erase/Write/Read Test
(#693)
2
XND