DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-787ISDN-PLK (ISDN-PRI Signaling Link Port)
10
1144 ABORT The Packet Bus in the PPN is out of service.
1. Follow the repair procedures for the Packet Bus.
2. Enter test port PCSSpp long and check the results of this test
(939).
2012
2100
ABORT
ABORT
Internal system error
Could not allocate the necessary system resources to run this test
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL The Loopback test has failed.
1. If this test fails repeatedly wait until all of the ports on the board
are idle (not in use) and reset the circuit pack. To reset the
circuit pack enter the commands busyout board PCSS and
reset PCSS.
2. Repeat the test, and if the test continues to fail replace the
circuit pack.
PASS 1. Connectivity of the D-channel over the Packet Bus is
operational.
Table 10-221. TEST #939 Signaling Port Packet Bus Loopback — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page